Research on Restraining Factors and Countermeasures of Old Residential Area Renovation Projects
DOI:
https://doi.org/10.54691/7f815y55Keywords:
Renovation of Old Residential Areas, Restraining Factors, ISM Model, C-OWA Combination Number Operator Model.Abstract
In the context of urban renewal, the renovation of old residential communities has garnered significant attention from academia and policymakers as a crucial component of urban revitalization efforts. Facing multiple constraints during renovation processes, this study systematically identified 19 key limiting factors through literature analysis, case studies, and expert interviews to explore their underlying mechanisms. By applying the ISM model to construct hierarchical factor structures and employing the C-OWA operator for quantitative weight analysis, the research reveals five core constraints: policy standardization and regulatory completeness, rational renovation planning, resident satisfaction levels, government implementation intensity, and social capital participation. The study further delineates hierarchical transmission pathways among these critical factors. Based on these findings, a three-tiered policy framework is proposed, encompassing strengthened government coordination, improved policy standards, optimized design methodologies, enhanced resident satisfaction, and stimulated social capital engagement. This framework provides theoretical foundations and practical references for targeted interventions in old community renovation initiatives.
Downloads
References
[1] Gao Lei. Promoting Urban Renewal to Enhance Livelihood Welfare: The 10th National Conference on Existing Building Renovation Held in Beijing. Urban and Rural Development, (2018) No.11, p58.(In Chinese)
[2] Zhang Xiaodong, Hu Juncheng, Yang Qing, Lin Yanling. Analysis and Renewal Strategy of Old Residential District. Urban Construction, (2017) No.11, p88-92.(In Chinese)
[3] Cai Jianguo, Sai Yunxiu. An Analysis of Influencing of Risk Factors in Shantytowns Renovation Project based on Interpretative Structural Modeling. Science and Technology Management Research, Vol. 34 (2014) No.(06), p.240-244.(In Chinese)
[4] Tian Yanqing, Yang Zhenhong, Li Hua, Shang Xuguang.Study on Affecting Factors of Risks at Workplace Based on ISM and AHP. China Safety Science Journal, Vol.21 (2011) No.(01), p.140-146.(In Chinese)
[5] Li Zhongfu, Li Zhouyang, Dai Liren, Cai Jin. Comprehensive Benefit Analysis of BIM in Green Building Operation Management Based on COWA-Fuzzy Set Pair. Construction Technology (Chinese and English), Vol.50(2021), No.13 , p134-138.(In Chinese)
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Frontiers in Science and Engineering

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.






